ClickCease
Skip to content
Search
Close this search box.

Epworth Healthcare Case Study

Epworth Healthcare is Victoria’s largest not-for-profit private hospital group, renowned for excellence in diagnosis, treatment, care and rehabilitation. Epworth is an innovator in Australia’s health system, embracing the latest in evidence-based medicine to pioneer treatments and services for our patients with 11 sites throughout Victoria, and over 10,000 staff.

Brief

When Epworth Healthcare needed a trusted provider to fitout their warehouse, they reached out to Bowen Storage to handle the project.

The brief from Epworth Hospital was to implement new pallet racking in their new warehouse and relocate their existing small parts shelving from their existing warehouse to the new facility.

Additionally, they needed our design team to increase warehouse storage capacity, design and supply the storage solutions and project manage the installation over several stages.

Epworth

Solution

Bowen Storage used our in-house designers for the layout and design of the new warehouse to improve efficiency and throughput.

The design included supplying our Stow pallet racking and incorporating white melamine shelves suitable for medical products. Shelving for medical parts and supplies was also relocated from the existing site, increasing available floor space for pallet racking.

We relocated their existing shelving in stages to ensure continued operations whilst being relocated. This included the removal of the old bulk pallet racking, making it easy for Epworth to exit the old facility.

The installation of the project was managed by Bowen Storage and carried out in several stages.

The downtime was minimised by liaising closely with the client and installing the storage systems around their existing stock and daily order picking schedules. After hours relocation of shelving fully stocked to allow the despatch team to continue unhindered.

The layout of the storage system was carefully designed to maximise capacity, taking into consideration staff amenities, emergency egress, and final order fulfillment processes. The design included racking and shelving storage systems, workbenches, and safety handrails.

The project was delivered by a carefully coordinated consolidation plan to allow minimal disruption to business whilst the existing sites were consolidated

Results

The Epworth Healthcare storage solution maximised operational efficiency and delivered significant improvements

  • Scalability
  • Additional space and resources
  • Increased inventory accuracy
  • Improved inventory rotation

 

Bowen Storage worked in close partnership with Epworth Healthcare and their supply chain logistics consultant throughout all stages of the project to ensure key performance objectives were achieved. Since the initial installation and relocation, Bowen has now assisted Epworth with additional storage systems to support their growth.

Download Epworth Healthcare case study

Share this project with your friends

You may also be interested in reading how Cotham Hospital optimised their warehouse too.

How can We Assist You?

Bowen Storage – 30 years and over 4000 Businesses
Use Our Solutions. We can assist you too!